Site icon Globalgbc.org

Floating solar energy

COURTESY : www.nrdc.org

FLOATING SOLAR ENERGY

India’s largest floating solar power project is expected to be commissioned in May 2021 in Telangana. Several other states, KarnatakaMadhya PradeshTamil Nadu, and West Bengal recently are also developing floating solar projects. Floating solar photovoltaic is a new business opportunity to meet India’s renewable energy targets and create jobs, as analyzed in a new case study.

Floating solar plant in IndiaSource: Siddhant Agarwal, QuantSolar

Floating Solar

Floating solar photovoltaic is an emerging segment in which solar photovoltaic (PV) modules are installed (floated) on a water body. Asia leads in global floating solar photovoltaic (FPV) deployment. Floating solar accounts for 2.6 gigawatts (GW) of installed capacity in August 2020 and it is expected to grow 20% annually to 2025.

Schematic representation of a floating solar plantSource: World Bank Group, ESMAP, and SERIS, 2019

India is a leader in clean energy—the country aims to install 175 GW of renewable energy by 2022 and 450 GW by 2030. Interest in FPV is growing in India with several water bodies across the country. FPV taps the country’s large water reservoirs to overcome some of the persisting issues of ground-mounted solar, such as the lack of levelled land, evacuation infrastructure and performance degradation due to high operating temperatures. India could potentially build 280 GW of FPV capacity by utilizing about 30% (nearly 1,800 kms2) of its medium and large water reservoirs.

India had about 2.7 MW of installed FPV capacity by the middle of 2019, and projects with a combined capacity of 1.5 GW capacity are under development. The Indian government has set a target to achieve 10 GW of FPV capacity by 2022. Investment costs and bid prices for FPV tenders have also been rapidly declining. As a result, India achieved the lowest cost for FPV projects at ₹35 ($0.5)/watt during the bid for 70 MW FPV capacity in Kerala.

Floating Solar and Jobs

A new case study, Employment Potential of Emerging Renewable Energy Technologies – Insights from the Floating Solar Sector, examines the direct employment potential across the floating solar project development cycle and captures the sector’s skill development needs. Estimates are drawn from project-based surveys and interviews with manufacturers, developers, and engineering, procurement, and construction (EPC) providers. The study provides insight into the operational strategies and team structure, in addition to discussing the typical duration of different phases of project development and the corresponding workforce employed. The case study is developed by the Council on Energy, Environment, and Water (CEEW) and Skill Council for Green Jobs (SCGJ) along with NRDC.

An FPV solar project includes four stages for a successful deploymentSource: CEEW-NRDC

Key Findings

Number of jobs in deploying a floating solar photovoltaic plant of different capacities (Source: CEEW-NRDC analysis)
* Typical duration of one periodic maintenance
** The number of permanent employees overseeing these activities. In addition, temporary staff is also sourced during each maintenance cycle, who carry out the maintenance activities like module cleaning.

Key Recommendations

With over 92GW of installed renewable energy capacity, India has made remarkable progress toward meeting its climate goals. Floating solar photovoltaic offers a new pathway for the country to realize its clean energy ambitions and create jobs. Floating solar helps tap into India’s large water reservoirs and overcome some of the persisting issues facing ground-mounted solar. FPV can generate additional employment opportunities in domestic manufacturing, research, and product design. New employment opportunities, especially in research and product design, beckon when FPV scales up in the country.

Exit mobile version